The guys have been doing lots of digging and have started laying blocks for the south side retaining wall for the floor.
They then got the form for the 7th arched column put back together and the column poured. Just one more column to go over on the north side, which will support the roof on the other side of the bbq.
Also on the north side we're putting a seating area, which will be roofed in pola to match the bar area on the south side of the restaurant. We marked the spot and started laying the blocks for the floor retaining wall on this north side.
After a few drainage pipes are laid, the soil tamped, and a few other bits and bobs, we might have a floor poured in the next couple weeks!