we now have two steps by the bbq, the floor for the northern seating area, the center walkway between the kitchen and the main restaurant floor, and the storage/reception bay between the booths and the kitchen.
we hopefully will pour the floor for the booths later today and then next week we'll finish the main restaurant floor slabs.
a very dramatic difference to the eye this week after taking such a long break to work on boats!